For the better part of three years, if you lived anywhere near Berne Street, you got used to orange construction fencing as part of the scenery. The mile-long gap in the Beltline between Ormewood Park and its neighbors broke ground in the summer of 2023 and stayed a work zone through two more summers after that, a stretch of chain-link and gravel where a finished trail was supposed to be. This spring, it finally wasn't. And the timing means this fall looks different than the last several falls did, because the trail's finish line landed just months before the neighborhood's biggest annual gathering hits its largest version yet.
The section that runs past Ormewood Park is officially called the Southeast Trail, though longtime residents may still know it by its old working name: Southside Trail Segments 4 and 5. It's 1.2 miles of finished, multi-use path that took nearly three years to build, about a year longer than originally planned, and it links four neighborhoods in one continuous stretch: Glenwood Park, Grant Park, Ormewood Park, and Boulevard Heights. Its completion pushed the Beltline's total mainline trail count to 14.8 miles.
The physical hinge point is the Berne Street bridge, which now carries walkers and cyclists directly between Ormewood Park and Grant Park without a car in sight. Atlanta Beltline Inc. held its ribbon-cutting this spring, and locals didn't wait for the ceremony to start using it. Regular foot and bike traffic showed up on the new pavement almost as soon as the fencing came down, according to reporting from Urbanize Atlanta, which has tracked the project's construction delays and eventual opening in detail.
If you've been avoiding that stretch because it was still a mess the last time you checked, it's worth a second look. The connection that used to require a car and a loop around surface streets is now a fifteen-minute walk.
Don't expect the whole corridor to feel finished, though. Just north of the new stretch, the segment along Bill Kennedy Way between Reynoldstown and Ormewood Park was slated to begin its own overhaul this summer, timed to start after Atlanta's 2026 FIFA World Cup matches wrapped. That project includes a wider trail bed, new lighting, benches, and a pedestrian bridge over I-20 that mirrors the look of the Peachtree Street crossings elsewhere in the city. The bridge portion alone is expected to take 18 to 24 months to finish.
So the honest picture for a resident planning a fall bike route is this: the piece that touches Ormewood Park directly is done and open, but the piece that would extend your ride further north toward Reynoldstown is now the construction zone. One project's finish line became the next one's starting gun.
The Ormewood Park Makers Festival returns Saturday, October 10, from 11 a.m. to 6 p.m., and this year marks its eighth run since founding in 2017. The festival is presented by SAND, South Atlantans for Neighborhood Development, and staged around Ormewood Church at 1071 Delaware Avenue, with workshops and classes spilling into the surrounding school and church grounds.
This year's edition is bigger on paper than any before it. Organizers are planning expanded live music programming and a larger Kids' Zone, on top of the usual mix of roughly 15 to 18 food and beverage vendors and 10 to 12 local nonprofit tables. Last year's festival drew somewhere between 3,000 and 4,000 attendees, and organizers are positioning this one to top that.
The logistics are worth knowing if you haven't been in a couple of years:
In past years, that 9 a.m. to 7 p.m. street closure meant anyone driving in had to find parking outside the closure zone and walk the last stretch anyway. This year, for the first time, that walk can start a lot further out. Anyone in Grant Park or Glenwood Park with the new Southeast Trail at their doorstep can now cover the distance to Delaware Avenue on the Beltline itself, skipping the usual scramble for a spot on a residential block that's already absorbing festival traffic. It's a small logistical shift, but it's the kind that changes whether you show up at noon or skip it because parking looked like a hassle.
The walk from the Berne Street bridge toward the festival grounds now passes a handful of things that weren't there, or weren't finished, the last time the trail was whole.
Near where Ormewood Park meets East Atlanta Village, The Gracewood recently claimed a long-vacant corner that had puzzled neighbors for months while it was under wraps. It's a brick-clad, loft-style building, and its completion closed out one of the more visible "what is that going to be" questions in the immediate area. A few blocks over, The Lodge, another project overlooking East Atlanta Village, announced its first tenants this spring after construction had been underway for some time.
Closer to the Ormewood and Moreland intersection, the retail cluster that includes Little Azio's and Morelli's Ice Cream sits on a piece of ground with more history than it looks like it has. That stretch uses an old rail right-of-way, part of the trolley line the Metropolitan Street Railroad Company ran along Underwood Avenue starting in 1891, for rear access and a small bridge. If you've ever noticed the odd wall angles on the commercial buildings at the northeast corner of Woodland and Delaware, that's the same trolley path still visible in the brickwork more than a century later.
None of this is new construction in the sense of glass towers changing the skyline. It's smaller and more specific: a finished loft building, a set of first-round tenants, an ice cream shop sitting on top of a trolley bed nobody thinks about until someone points it out.
Put the two threads together and the shift is simple. For the first time since the Southeast Trail broke ground in 2023, the path is actually finished at the same moment the neighborhood's marquee event is scaling up. That overlap hasn't happened before, because the trail wasn't there for the last several festivals. This year it is, which means the choice between driving in and finding parking within the closure zone, or walking in from Grant Park or Glenwood Park along a route that didn't exist last October, is a real choice for the first time.
If you're the type to bike the Beltline on an ordinary Saturday anyway, October 10 is a good excuse to route it toward Delaware Avenue instead of turning around at the usual spot. If you're the type who's been putting off checking out the new stretch because you assumed it was still torn up, this is as good a nudge as any. The fencing came down. The path is there. The festival that used to require a parking plan now doesn't have to.
If you're weighing a move into Ormewood Park or wondering what a finished Beltline connection does for property values along it, that's a longer conversation, and one worth having with someone who tracks this corridor closely. Shawn Morgan works this stretch of intown Atlanta neighborhood by neighborhood, including the blocks the Southeast Trail now touches. Reach out for a free home valuation if you want to know what a finished trail segment and a bigger annual festival mean for a specific address, not just the neighborhood in general.
A thorough grasp of residential real estate marketing tactics, a keen knowledge of the Atlanta market, superior listening skills and attention to detail, make him the model Realtor® advisor. Contact Shawn today!
Let's Connect